Fitech Material(s), making the real difference
Quality First
Competitive Price
First-class Production Line
Factory Origin
Customized Services
Anhui Fitech Material Co.,Ltd has successfully certified by ISO 14001:2015 environmental management system,ISO 9001:2015 quality management system and ISO 45001 occupational health and safety certification. As a professional manufacturer and supplier, we have our own professional technology team to meet any of your requirements in quality and technology. If you want to buy Cobalt base alloy powder, Nickel base alloy powder, Ferro base alloy powder, Titanium base alloy powder, other 3D printing powder, or look for price quotation, please contact judy@fitechem.com
Main products |
Cu |
|||
Mobility | 15-53μm | ≤18s/50g | ||
Bulk density |
≥4.3g/cm3 |
|||
Oxygen content |
≤200ppm |
|||
Nitrogen content |
≤200ppm |
Purity: | 99.9% | Model Number: | Pcopper powder |
Alloy Or Not: | Non-Alloy | Dimensions: | 15um min |
Formula: | Cu | Molecular weight: | 63.55 |
CAS No: | 7440-50-8 | Melting Point: | 1083ºC |
EINECS No: | 231-159-6 | Density: | 8.92g/cm3 |
Boiling Point: | 2595ºC | MOQ: | 10kg |
Aerospace
Mold making
Automobile manufacturing
Used in the production of microelectronic devices, used to manufacture the terminals of multilayer ceramic capacitors. It can also be used as a catalyst in the reaction process of synthesizing methanol from carbon dioxide and hydrogen. It can also be used as petroleum lubricant and medicine, electroplating, coating industry, etc.
Copper powder can be widely used in powder metallurgy, electrocarbon products, electronic materials, metal coatings, chemical catalysts, heat dissipation tubes, filters, thermal conductive materials, friction materials, resin grinding plate, diamond grinding wheel, spraying materials, welding
materials, chemical catalyst, heat pipes and other mechanical and electrical parts and in the field of electronic aviation.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.