Fitech Material(s), making the real difference
Quality First
Competitive Price
First-class Production Line
Factory Origin
Customized Services
Anhui Fitech Material Co.,Ltd has successfully certified by ISO 14001:2015 environmental management system,ISO 9001:2015 quality management system and ISO 45001 occupational health and safety certification. As a professional manufacturer and supplier, we have our own professional technology team to meet any of your requirements in quality and technology. If you want to buy Cobalt base alloy powder, Nickel base alloy powder, Ferro base alloy powder, Titanium base alloy powder, other 3D printing powder, or look for price quotation, please contact judy@fitechem.com
It has high strength, toughness and outstanding hardenability and stability against overheating, but it has high sensitivity to white spots and temper brittleness. The weldability is poor, and it needs to be preheated at high temperature before welding, and stress should be removed after welding.
Items | Chemical Composition(wt%) | Remark | |||||||||
Alloy | C | Si | Cr | Ni | Mn | Mo | Cu | W | V | Fe | |
4340 | 0.38-0.43 | 0.15-0.35 | 0.7-0.9 | 1.65-2.00 | 0.6-0.8 | 0.2-0.3 | - | - | - | Bal. | - |
3D printing technology is a kind of rapid prototyping technology. It is a digital model file based on the use of metal powder, through the way of printing layer by layer to construct the object technology. In recent years, with the rapid development of 3D printing equipment, 3D printing has been widely used in mold manufacturing, automotive, aerospace, dentistry, medical education and other industrial fields.
Aerospace
Mold making
Offshore platforms, helicopter decks, other platforms
Food industry
Pulp and paper industry
Aerospace (turbine blades)
Mechanical parts
Nuclear waste barrels
Particle Size | TappingDensity | Flowability | Particle Size Distribution (μm) | ||
(g/cm³) | (s/50g) | D10 | D50 | D90 | |
15-45μm | 4.4-4.9 | ≤30 | 17-22 | 30-34 | 48-55 |
15-53μm | 4.4-4.9 | ≤30 | 20-25 | 32-37 | 51-61 |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.